Sebanyak 1 item atau buku ditemukan

The Iraqi Revolution in Its Second Year

385/986. 43) Laying of sewerage pipes and paving Streets No. 207, Arasat-al-
Witri that comprise three roads which run paralled to the Railways in the Ghazali
Area and in width the local system pavement varies between 8 to 10 metres.